Electrical Engineer (Qatar Exam) Test-23

FemaleMale
15 Questions - Developed by:
- Updated on: - 406 taken

Qatar engineering registration exam preparation

  • 1
    If you were awarded a project, you will start work
  • 2
    Project Scope Management
  • 3
    Scope Management starts with is:

  • 4
    Final as built drawings for what purpose
  • 5
    Control department work starts
  • 6
    Project management is ideally suited except

  • 7
    A critical path is the ----------------------in the project management:
  • 8
    The forward pass review of the project management will indicate the following:
  • 9
    Intersecting point for WBS and OBS
  • 10
    Gypsum board at residence and industrial building used except

  • 11
    Acceptable reasons for project stopping, except?
  • 12
    Before starting work at site, the major factor has to be checked is?
  • 13
    Software programming flow
  • 14
    In network which point getting more inward flow?
  • 15
    What is the least level of WBS?

Comments (0)

autorenew